Par mbig5637
15 novembre 2019
They placed a line of stakes out of position to endpoints, one being underwater. After my surveyor identified the stake they returned to the site, trampled the very very soft ground around the underwater stake and recorded its position in a different location. They also drove a stake in at an angle deliberating damaging a drainage pipe.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ